We passed the all the foundation inspections and framing will be starting on Monday. Sounds like things will really take off from here. We reviewed some exterior door options and need to get the windows ordered so the we will have the exterior shell completed before the main rain season starts.
We do have some work that did come up unexpectedly. Plumbing for a new water line from the existing meter to the house. The existing is only a half inch galvanized line and we are replacing that with a 3/4 inch copper line to bring us back the pressure and avoid future corrosion in the line.