Here are a couple of photos from today, one showing the roof sheathing and the other photo a close up of the california framed cricket where the new addition's roof is over the existing roofing. Plywood was added as a temp till we put the metal roof panels over the 2-2x4's which are running on top of the existing roof. I need the 2-2x4's so that we can put insulation between those 2x4's and the total thickness of the roof insulation will meet with the California energy code requirements.


The framers for next week will work on the breezeway, adding plywood sheathing, frame the door openings on either side of the breezeway and frame in the expanded living room. They will also be fixing the roof framing in the garage and frame in correctly the garage door opening.